Menderix van next to the open-sided solar carport.

Solar and EV charging

A solar carport with EV charging at the post

The steel frame provides covered parking and supports the solar modules overhead. At the edge of the parking bay, Menderix mounted a subpanel and an EV charger on the same column. A driver can park under the canopy and reach the connector from beside the vehicle.

Canopy: Steel frame with solar modulesElectrical distribution: Carport subpanelCharging point: Post-mounted EV charger

From bare steel to a covered parking bay

Before the panels went up, the steel beams were open to the sky. The finished rows of solar panels span the frame and provide shade for the space below. We used one of the outer posts to bring charging to the edge of the parking bay.

The open steel frame before module installation.
Completed solar modules over the steel parking canopy, viewed from above
The finished canopy with rows of solar modules over the parking area.
Subpanel and charging cable at the edge of the covered parking bay.
The subpanel and wiring route at the carport column.
EV charging cable coiled on its holder.
The connector and cable stored on the charging post.

The charger and subpanel share a post

Conduit runs up the steel post beside the subpanel toward the canopy. The driver uses the connector lower down. After charging, the connector hangs on its holder and the cable coils beneath it.

Placing both units at the edge leaves the center of the bay clear. A driver can reach the car’s charging port and an electrician can get to the subpanel for service.

Planning a charger for another carport

Start with the parked car

Park the car the way you normally do and note which side the charging port is on. A photo from that spot helps us work out where the charger should go so the cable reaches without crossing a walkway or the next parking space.

Trace the electrical route

The nearest post may suit the driver but be awkward to reach from the electrical supply. A site visit can establish the available panel capacity, the length of the run and whether a local subpanel makes sense.

Separate solar output from charging demand

Solar production changes through the day. How much of a charging session the array can cover depends on when you plug in and how much electricity the rest of the site is using at the time.

Adding a charger to covered parking?

Send a view of the parking bay, the post or wall you have in mind, and the location of the existing electrical equipment. Tell us which vehicle will charge there.