Plan the work. Understand the cost.

Electrical and solar pricing in Sacramento

Replacing a switch and running a new circuit are different jobs, even when they start at the same wall. Use these starting prices to plan your budget, then tell us about the property so we can discuss the work your project needs.

Sacramento area · Monday–Sunday, 8 am–6 pm Pacific

$119

Listed service call and diagnostic fee. Confirm what the visit covers when booking.

Arrange a diagnostic visit

An estimate or a diagnostic visit?

A project estimate looks at work you already have in mind: an EV charger, new lighting, a panel upgrade or a solar installation. Menderix offers free project estimates. Depending on the work and location, we may start with photos, plans or a virtual conversation before arranging a site visit.

A diagnostic visit investigates a problem, such as a circuit that keeps tripping or a solar system that has stopped producing. Our listed service call and diagnostic fee is $119. Contact us to confirm the visit's scope, any additional testing, and whether repair work will need a separate quote.

Electrical work: starting prices

These figures are starting prices, not a fixed quote for every property. Wiring condition, access, equipment, circuit length and required approvals can change the cost. Confirm exactly what is included before authorizing work.

ServiceStarting price
Troubleshooting / diagnostic service call$119
Electrical repairsFrom $150
Urgent same-day service callCall to check availability; a same-day appointment is not guaranteed.From $250
Smoke or carbon monoxide detector installationFrom $120
New outlet installationFrom $180
GFCI outlet installationFrom $190
Appliance circuitFrom $450
Standard light fixture installationFrom $150
Recessed lighting installationFrom $170
Ceiling fan installationFrom $200
Smart switch installationFrom $250
Dimmer or switch replacementFrom $120
Level 2 EV charger installationFrom $720
Generator interlock / inlet installationFrom $600
Main panel upgrade with permitsFrom $4,500
Whole-home rewiringFrom $8,000
Whole-home surge protectionFrom $450

Solar and battery project budgets

System size gives a useful starting point. Roof condition, equipment choice, electrical upgrades and the circuits you want backed up still need a closer look. Solar capacity is shown in kW; battery storage capacity is shown in kWh.

ServiceStarting price
Solar troubleshooting and minor repairsFrom $180
5 kW solar installationFrom $12,500
8 kW solar installationFrom $20,000
10 kW solar installationFrom $25,000
5 kW solar + 5 kWh batteryFrom $19,000
8 kW solar + 5 kWh batteryFrom $27,000
10 kW solar + 10 kWh batteryFrom $35,000
20 kW solar + 20 kWh batteryFrom $68,000
20 kW solar + 40 kWh batteryFrom $85,000

Compare the scope, as well as the total

Two quotes can name the same service and cover different work. Before choosing one, check the equipment, route and finish details. A nearby garage charger and a charger across a finished house will rarely cost the same.

  • Equipment: the model, quantity, capacity and who supplies it.
  • Labor and wiring: route, circuit length, access and any troubleshooting.
  • Approvals: permits, inspections, utility coordination and associated fees.
  • Property work: trenching, wall or ceiling openings, patching and finishing.
  • Completion: testing, documentation, warranty terms and any exclusions.

Mention related work early. An EV charger, battery and future heat pump may affect the same electrical system, so planning them together can avoid repeating part of the work.

Budget planning

Check incentives before setting your budget

Program information below was checked on October 6, 2026. Approval, equipment eligibility and funding depend on the program. An advertised maximum is not a promised reduction in your project price.

SMUD battery incentives

For interconnection applications received on or after September 23, 2026, SMUD lists an enrollment incentive of up to $6,000 per household. Earlier projects have different deadlines. Review the eligible equipment, enrollment requirements and program terms before counting an incentive in your budget.

Read SMUD's current requirements

Federal residential clean energy credit

The IRS states that the residential Section 25D credit is not available for property placed in service after December 31, 2025. Do not assume a new 2026 residential installation receives the former 30% credit. Ask your tax adviser about your own circumstances and any different programs that may apply.

Read the IRS guidance

California SGIP

California's Self-Generation Incentive Program has specific eligibility categories and funding limits. Check the relevant program administrator and current budget before relying on a rebate.

Check SGIP with the CPUC

Get a quote for the property you have

Send your city or ZIP code, describe the work and tell us about any equipment you have already selected. For a repair, include what stopped working and when it happens. We'll discuss the next step and whether the job needs an estimate or a diagnostic visit.

Request project pricing

    Fields marked * are required.

    We’ll use your details to respond to your inquiry. Privacy Policy.